Avant Garage
New Construction Project Summary
The Avant Garage is a new 4 townhome project developed by Postgreen Homes and designed by Interface Studio Architects for a very specific site. The project is on a side street with off street parking made possible with a unique straight through 2-car garage underneath a very custom split-level design that creates 13′ tall ceilings in the main room. The Avant Garage project also includes our first project that is incorporating roof decks surrounded by a green roof on all four units. Like most Postgreen Homes projects, this will be seeking Energy Star and LEED Platinum certification as well.
Key Project Stats
- 5 month build
- LEED Platinum (Certification in Progress)
- Energy Star Certification
- Green Roof Decks
- Double Stud Walls with Cellulose Insulation
- Highly Custom Split-Level Design
- Low-Flow fixtures
- Rainwater Collection
- Permeable landscaping & drought tolerant plantings
- High Efficiency Heat Pump HVAC & Water Heating
- Triple Pane Fiberglass Windows
- Low-VOC paints and finishes
Hybrid Responsibilities
- New Construction Project Management
- Energy Star Documentation & Certification Management
- LEED Documentation & Certification Management